£1M+ Saved by deferring a scheduled ILI run
ALERT's corrosion modelling gave a global operator a defensible case for exemption from a scheduled inline inspection on a late-life North Sea pipeline.
Case Studies
Explore our customer success stories.

ALERT's corrosion modelling gave a global operator a defensible case for exemption from a scheduled inline inspection on a late-life North Sea pipeline.

How Imrandd's EXACT analytics regained confidence in integrity data on a late-life FPSO and cut planned inspection by 35%.

How Imrandd's EXTRACT tool turned 80,000 legacy inspection documents into a single searchable database in two days.

EXACT analytics across four assets cut piping inspection effort and spend by 26%, saving £2.65m and an average 26 tonnes of CO₂ per asset per year.

A multi-year topsides analytics and inspection support contract across seven UKCS assets saved £1m+ in year one and removed over 17,000 hours from the inspection plan.

How risk-based and non-intrusive inspection let a global operator defer shutdown on a late-life FPSO, saving $700,000 directly and $70,000,000 indirectly.

Internal and external condition assessments, combining EXACT with GDi Vision, gave an international operator a remedial programme for a newly acquired FPSO up to COP 2035.

A phased, data-driven review of integrity and inspection data across three North Sea assets recommended a 30–50% reduction in inspection scope before COP.

Detailed statistical analysis of inline inspection data on a 30 km subsea flowline revealed corrosion below standard ILI reporting criteria and reshaped the operator's corrosion KPIs.

EXTRACT and a newly developed image classification model digitised and classified eight years of legacy files from two North Sea assets, ready for a new IDMS.

A long-running integrity management partnership on two North Sea FPSOs cleared a backlog of over 1,000 unassessed anomalies and refocused inspection on what matters.

Working with the operator and DNV, Imrandd implemented one of the UK's first class-approved RBI integrity management strategies for a new-build FPSO.

An audit and rebuild of the RBI strategy for an FPSO nearing twenty years on station, bringing it in line with the operator's class-approved approach elsewhere.

A novel testing approach assured ship side valves on a North Sea FPSO without ROV, divers or dry-docking – and is now approved by the HSE in the UK.